User Tools

Site Tools


example-formulas

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
example-formulas [2018/02/23 18:46]
sroehling
example-formulas [2018/02/24 00:11] (current)
sroehling
Line 8: Line 8:
 For project tasks whose completion is determined by a checklist (i.e., "​checklist driven tasks"​),​ there typically needs to be a calculated field to track which checklist items have been set and the progress towards completion of the overall task. For project tasks whose completion is determined by a checklist (i.e., "​checklist driven tasks"​),​ there typically needs to be a calculated field to track which checklist items have been set and the progress towards completion of the overall task.
  
-For example, the image below shows an example checklist ​from a [[forms|form]]:​+For example, the image below shows an example checklist ​displayed on a [[forms|form]]:​
  
 {{wiki:​exampleformulachecklist.png}} {{wiki:​exampleformulachecklist.png}}
example-formulas.txt ยท Last modified: 2018/02/24 00:11 by sroehling