User Tools

Site Tools


scrum-template

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
scrum-template [2018/04/30 22:14]
sroehling
scrum-template [2018/04/30 22:17] (current)
sroehling [Spinning Down Remaining Effort]
Line 9: Line 9:
 Depending on the type of project being tracked, Resultra supports numerous different ways to mark a task as being complete. For example, a simple checkbox can be used, a completion date, or a multi-part checklist. ​ Depending on the type of project being tracked, Resultra supports numerous different ways to mark a task as being complete. For example, a simple checkbox can be used, a completion date, or a multi-part checklist. ​
  
-However, the factory template for scrum-based tracking uses a very simple method to track remaining effort and task completion. In particular, the task is consider done when the remaining effort is set to 0. The completion date is a calculated field, based upon the date when the remaining effort was set to 0.+However, the factory template for scrum-based tracking uses a very simple method to track remaining effort and task completion. In particular, the task is consider done when the remaining effort is set to 0. In the forms to change remaining effort, there is a spinner control next to this value; therefore, the remaining effort will typically be changed with this spinner control, and completing the task can be thought of as "​spinning down" the remaining effort.The completion date is a calculated field, based upon the date when the remaining effort was set to 0. 
 + 
  
 ===== Supporting Multiple Sprints ===== ===== Supporting Multiple Sprints =====
scrum-template.txt · Last modified: 2018/04/30 22:17 by sroehling